您当前的位置:
首页 >
文章列表页 >
DESIGN AND OPERATION OF AGC FUNCTION FOR 300 MW UNITS
Thermal Power Generation   Vol. 38, Issue 5, Pages: 88-90(2009)
更新时间:2025-09-28
    • DESIGN AND OPERATION OF AGC FUNCTION FOR 300 MW UNITS

    • CLC: TM621
    • Published:2009

    移动端阅览

  • LUO Jian-ke Weihe Power Generation Co Ltd. DESIGN AND OPERATION OF AGC FUNCTION FOR 300 MW UNITS[J]. Thermal Power Generation, 2009, 38(5): 88-90. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

71

下载量

0

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

Optimization on coordinated control system of supercritical unit in Huaneng Shanghai Shidongkou Second Power Plant
OPTIMIZATION OF DEB COORDINATED CONTROL SYSTEM FOR 300 MW UNIT
CAUSE ANALYSIS AND CONTROL MEASURES OF UNSTABLE VIBRATION IN SHAFTING SYSTEM OF 300 MW TURBO-GENERATOR
CAUSE ANALYSIS OF HIGH-PRESSURE HEATER LEAKAGE FOR 300MW UNIT AND COUNTERMEASURES THEREOF
CAUSE ANALYSIS OF WATER CONTENT EXCEEDING STANDARD LIMIT IN TURBINE OIL AND TREATMENT THEREOF

Related Author

ZHAO Zhidan
GU Tao
CHEN Zhigang
XI Chengchao
GUO Jianhui
YU Jing
HE Tong-xiang
ZHANG Hua-lei

Related Institution

Xi'an Thermal Power Research Institute Co., Ltd
Huaneng Shanghai Shidongkou Second Power Plant
North China Electric Power University
Huadian Xinjiang Branch
0