PROPOSALS TO DEAL WITH ABNORMAL CONTROL OF CCS CAUSED BY SERVO VALVES IN A 300 MW UNIT
Thermal Power Generation   Vol. 38, Issue 5, Pages: 59-61(2009)
更新时间:2025-09-28
    • PROPOSALS TO DEAL WITH ABNORMAL CONTROL OF CCS CAUSED BY SERVO VALVES IN A 300 MW UNIT

    • CLC: TK228
    • Published:2009

    移动端阅览

  • HUANG Wei-jian1, HE Guan-sheng2, ZHU Ye-tian2, et al. PROPOSALS TO DEAL WITH ABNORMAL CONTROL OF CCS CAUSED BY SERVO VALVES IN A 300 MW UNIT[J]. Thermal Power Generation, 2009, 38(5): 59-61. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

63

下载量

1

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

PRIMARY FREQUENCY REGULATION PERFORMANCE TEST OF A 300MW FOSSIL-FIRED GENERATING UNIT
LVDT faults auto-monitoring technology for turbine governing valve based on video processing
Numerical simulation of cavitation in main feed valve of ultra-supercritical units
Flow field in regulating valve of water storage tank for ultra supercritical unit boiler:characteristics and optimization
Fieldbus commissioning method and problem handling for coal-fired power plants

Related Author

SUN Shu-yang
ZHANG Jiangfeng
YIN Feng
SU Ye
WANG Zixiang
WEI Luping
LIU Jia
HE Qingzhong

Related Institution

Jianbi Power Plant
State Gird Zhejiang Electric Power Research Institute
State Gird Zhejiang Electric Power Corporation
Sichuan University of Science & Engineering
School of Mechanical Engineering,Sichuan University of Science & Engineering
0