您当前的位置:
首页 >
文章列表页 >
Retrofitting of reheaters in 300 MW and 600 MW unit pulverized coal boilers
Thermal Power Generation   Issue 12, (2015)
更新时间:2025-09-28
    • Retrofitting of reheaters in 300 MW and 600 MW unit pulverized coal boilers

    • CLC: TK223.3
    • Published Online:15 January 2016,

      Published:2015

    移动端阅览

  • JIA Li, XIAO Faqi, CAI Xinchun, et al. Retrofitting of reheaters in 300 MW and 600 MW unit pulverized coal boilers[J]. Thermal Power Generation, 2015, (12). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

426

下载量

0

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

Convective heat transfer characteristics of boiler high temperature superheater under pressurized oxygen enrichment condition
Practice and optimization of combined pipe-blowing method for domestic first double-reheat unit
Arrangement optimization for temperature measuring points on tube wall of (ultra) supercritical boilers
Experimental study on optimization and adjustment of wall temperature of reheater tubes in an ultra supercritical double-reheat boiler
Experiments about co-firing shale with Zhundong coal in a 100 MW unit boiler

Related Author

LI Xiaomin
WANG Lijun
GAO Jinghui
WANG Lin
YANG Bo
ZHANG Yafu
ZHAO Zhidan
WANG Hongyu

Related Institution

School of Architecture and Surveying Engineering, Shanxi Datong University
Guodian Power Datong Power Generation Co., Ltd.
Xi’an Thermal Power Research Institute Co., Ltd.
Shenhua Guohua Electric Power Research Institute Company Limitied
Xi’an Thermal Power Research Institute Co., Ltd., Suzhou Branch
0