您当前的位置:
首页 >
文章列表页 >
Failure analysis of flange used for urea hydrolysis equipment
Thermal Power Generation   Issue 5, (2016)
更新时间:2025-09-28
    • Failure analysis of flange used for urea hydrolysis equipment

    • CLC: TG172.82
    • Published Online:15 June 2016,

      Published:2016

    移动端阅览

  • HUANG Jinyang, YANG Zheng, LU Jintao, et al. Failure analysis of flange used for urea hydrolysis equipment[J]. Thermal Power Generation, 2016, (5). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

363

下载量

0

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

Problem analysis for transportation of urea hydrolysis production gas for thermal power plants
Research and application of data-based optimization technology for operation of denitrification system in utility boilers
Typical faults and countermeasures of flue gas cooler for coal-fired boilers
Model for predicting SCR flue gas denitration efficiency based on particle swarm optimization and twin support vector machine

Related Author

ZHANG Bo
ZHANG Xiangyu
LI Minghao
TIAN Wenchao
XU Hongjie
NIU Guoping
CHANG Lei
JIA Linquan

Related Institution

Xi'an Thermal Power Research Institute Co., Ltd
School of Information Science and Technology, Zhejiang Sci-Tech University
Focused Photonics (Hangzhou) Inc.
Xi’an Thermal Power Research Institute Co., Ltd.
Department of Automation, North China Electric Power University
0