Study on installation of high-temperature heat exchanger for a 1 100 t/h tower type boiler
Thermal Power GenerationIssue 2, (2016)
更新时间:2025-09-28
分享给微信好友或者朋友圈
导出参考文献
Study on installation of high-temperature heat exchanger for a 1 100 t/h tower type boiler
作者机构:
华电电力科学研究院,浙江,杭州,310030
作者简介:
基金信息:
DOI:
CLC:TK223.4
Published Online:15 March 2016,
Published:2016
稿件说明:
移动端阅览
LIU Bo, ZHENG Wenguang, LI Yunchao. Study on installation of high-temperature heat exchanger for a 1 100 t/h tower type boiler[J]. Thermal Power Generation, 2016, (2).
DOI:
LIU Bo, ZHENG Wenguang, LI Yunchao. Study on installation of high-temperature heat exchanger for a 1 100 t/h tower type boiler[J]. Thermal Power Generation, 2016, (2).DOI:
Study on installation of high-temperature heat exchanger for a 1 100 t/h tower type boiler