您当前的位置:
首页 >
文章列表页 >
Optimization design of steam turbine with double-reheat in a 1 350 MW ultra-supercritical unit
Thermal Power Generation   Issue 12, (2015)
更新时间:2025-09-28
    • Optimization design of steam turbine with double-reheat in a 1 350 MW ultra-supercritical unit

    • CLC: TK262
    • Published Online:15 January 2016,

      Published:2015

    移动端阅览

  • ZHANG Xiaoling, YAN Weiping, LIU Liheng, et al. Optimization design of steam turbine with double-reheat in a 1 350 MW ultra-supercritical unit[J]. Thermal Power Generation, 2015, (12). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

490

下载量

0

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

Thermal hydrodynamic performance of vertically-upward water wall in an ultra-supercritical double-reheat boiler with high working parameters
Analysis and optimization for online operation performance indexes of the ultra supercritical 1 000 MW double-reheat unit in Laiwu Power Plant
Computational analysis on hydrodynamic characteristics and flow instability of an ultra supercritical 1 000 MW double-reheat unit boiler
Research on coupling calculation method of combustion and hydrodynamics for water walls in ultra-supercritical double-reheat boilers
Development and expectation of application of ultra-supercritical double-reheat steam turbines

Related Author

MAO Yijun
HE Lijun
ZHANG Yifan
YANG Yu
BAI Wengang
WU Tao
CHU Mo
MA Pengbo

Related Institution

Huaneng Anyuan Power Generation Co., Ltd.
Guodian Taizhou Power Generation Co., Ltd.
Xi’an Thermal Power Research Institute Co., Ltd.
Huaneng Laiwu Power Generation Co., Ltd.
State Key Laboratory of Multiphase Flow in Power Engineering, Xi’an Jiaotong University
0