您当前的位置:
首页 >
文章列表页 >
Heat balance of evaporation tower for FGD wastewater treatment
Thermal Power Generation   Issue 1, (2017)
更新时间:2025-09-28
    • Heat balance of evaporation tower for FGD wastewater treatment

    • CLC: TK09;X703
    • Published Online:24 January 2017,

      Published:2017

    移动端阅览

  • JIA Shaoguang, HUANG Kai, WU Congyue, et al. Heat balance of evaporation tower for FGD wastewater treatment[J]. Thermal Power Generation, 2017, (1). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

1086

下载量

0

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

Prediction of limestone-gypsum wet flue gas desulfurization efficiency based on T-S fuzzy neural network
STUDY ON AND APPLICATION OF LOCALIZED TREATMENT SYSTEM FOR WASTE WATER FROM WET DESULFURATION FACILITY
AN APPROACH TO CONTROLLED ITEMS AND STANDARDS FOR EFFLUENTQUALITY OF DESULFURATION WASTE WATER
OPTIMIZED RETROFIT OF WASTEWATER TREATMENT SYSTEM IN WET DESULPHURIZATION OF 600 MW UNIT
Experimental research on COD treatment for carbide slag-gypsum flue gas desulfurization wastewater

Related Author

LI Bin
DENG Yu
BIAN Yuming
QI Nianzhe
王正江
杨宝红
王璟
许臻

Related Institution

School of Energy Power and Mechanical Engineering, North China Electric Power University
Xi'an Thermal Power Research Institute Co.,Ltd.
Xi'an Thermal Power Research Institute Co., Ltd
Datang Tangshan Thermal Power Co., Ltd.
0