您当前的位置:
首页 >
文章列表页 >
Thermal-economic analysis for scheme of steam turbine generator placement in high and low platform separately
Thermal Power Generation   Issue 6, (2017)
更新时间:2025-09-28
    • Thermal-economic analysis for scheme of steam turbine generator placement in high and low platform separately

    • CLC: TK262
    • Published Online:30 June 2017,

      Published:2017

    移动端阅览

  • FU Yiwei, XIE Tian, QU Jie. Thermal-economic analysis for scheme of steam turbine generator placement in high and low platform separately[J]. Thermal Power Generation, 2017, (6). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

894

下载量

0

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

Overall economical performance of 1 000 MW class ultra-supercritical unit with double-reheat cycle
Analysis and optimization for online operation performance indexes of the ultra supercritical 1 000 MW double-reheat unit in Laiwu Power Plant
Analysis on energy saving potentials of overheat recovery of steam extractions for double-reheat power unit
Evaluation methods for turbine steam seal retrofitting
Development and expectation of application of ultra-supercritical double-reheat steam turbines

Related Author

YAO Xiaolin
FU Chang
SHI Yanzhou
MENG Guixiang
WANG Anqing
WU Tao
CHU Mo
MA Pengbo

Related Institution

Xi’an Thermal Power Research Institute Co., Ltd.
Huaneng Laiwu Power Generation Co., Ltd.
State Key Laboratory of Multiphase Flow in Power Engineering, Xi’an Jiaotong University
Xi'an Thermal Power Research Institute Co.,Ltd.
Dongfang Turbine Co., Ltd.
0