您当前的位置:
首页 >
文章列表页 >
石洞口电厂2号机组协调控制系统的改进与完善化
Thermal Power Generation   Issue 4, Pages: 48-50(1997)
更新时间:2025-09-28
    • 石洞口电厂2号机组协调控制系统的改进与完善化

    • DOI:10.19666/j.rlfd.1997.04.013    

      CLC: TM621
    • Published:1997

    移动端阅览

  • [J]. Thermal Power Generation, 1997, (4): 48-50. DOI: 10.19666/j.rlfd.1997.04.013.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

23

下载量

0

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

Optimization and fixed value disturbance test analysis for coordination control system of a supercritical 660 MW unit
A coordinated control system based on model predictive coal supply feedforward
Fuzzy assessment of performance of coordinated control system in thermal power unit based on covariance index
ANALYSIS AND COMPARISON OF PERFORMANCE BETWEEN TWO KINDS OF TURBINE-BOILER COORDINATED CONTROL SYSTEM
THE OPTIMIZATION STRATEGY OF COORDINATED CONTROL SYSTEM FOR 600 MW THERMAL POWER PLANT

Related Author

QIAN Neng
LI Ke
WANG Yinsong
JI Yu
YAO Cuixia
QI Haiwang
LIN Mao
ZHOU Yuyang

Related Institution

Hebei Engineering Research Center of Simulation & Optimized Control for Power Generation,North China Electric Power University
Control Technology Department,Zhejiang Energy Group R&D
Linhe Thermal Power Plant, China Huaneng Group, Linhe
Baotou No.1 Thermal Power Plant, China Huaneng Group
Xinhua Control Engineering Co., Ltd.
0