您当前的位置:
首页 >
文章列表页 >
MODIFICATION OF INSULATION AND SEALING OF RUSSIA 230 t/h BOILER
Thermal Power Generation   Issue 1, Pages: 59-61(2000)
更新时间:2025-09-28
    • MODIFICATION OF INSULATION AND SEALING OF RUSSIA 230 t/h BOILER

    • DOI:10.19666/j.rlfd.2000.01.015    

      CLC: TK229
    • Published:2000

    移动端阅览

  • MODIFICATION OF INSULATION AND SEALING OF RUSSIA 230 t/h BOILER[J]. Thermal Power Generation, 2000, (1): 59-61. DOI: 10.19666/j.rlfd.2000.01.015.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

85

下载量

4

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

AIR PREHEATER SEAL RETROFITTING OF THE 800 MW BOILER
Structure optimization for pulverized coal mixer of a 300 MW unit boiler
Operation adjustment for high temperature corrosion in water wall of supercritical opposed firing boiler
Effect of coal type on oxygen-enriched combustion boiler based on entropy analysis
Research on main and reheat steam temperature lifting method for ultra supercritical 1 000 MW unit double-tangential circular boiler

Related Author

ZOU Hai-feng1
LI Ying21.School of Business Administration
ZHU Zhaoyang
ZHOU Fei
MU Weifu
JI Haimin
ZHOU Ping
LU Fen

Related Institution

School of Business Administration, North China Electric Power University
Shenhua Guohua (Beijing) Electric Power Research Institute
Fengtai Power Generation Co., Ltd., Fengtai
Xi’an Thermal Power Research Institute Co., Ltd.
Huaneng Liaocheng Thermal Power Generation Co., Ltd.
0