ANALYSIS ON BULLDING GAS-STEAM COMBINED CYCLE POWER PLANT FOR OPTIMIZING THE POWER SOURCE STRUCTURE
Thermal Power Generation   Issue 2, Pages: 9-11(2001)
更新时间:2025-09-28
    • ANALYSIS ON BULLDING GAS-STEAM COMBINED CYCLE POWER PLANT FOR OPTIMIZING THE POWER SOURCE STRUCTURE

    • DOI:10.19666/j.rlfd.2001.02.003    

      CLC: TM611.3
    • Published:2001

    移动端阅览

  • ANALYSIS ON BULLDING GAS-STEAM COMBINED CYCLE POWER PLANT FOR OPTIMIZING THE POWER SOURCE STRUCTURE[J]. Thermal Power Generation, 2001, (2): 9-11. DOI: 10.19666/j.rlfd.2001.02.003.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

79

下载量

2

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

Integration and performance analysis of high back pressure gas turbine combined cycle power generation system
Economic research on desulfurization and denitration for a supercritical 350 MW circulating fluidized bed boiler
Influence of steam extraction for heating on HRSG steam parameter
Energy utilization in distributed system based on equivalent power consumption method

Related Author

薛鹏
高四艺
杨雨
冯志恒
李永毅
张国强
WANG Lin
GAO Jihui

Related Institution

Xi’an Thermal Power Research Institute Co., Ltd.
School of Energy Science and Engineering, Harbin Institute of Technology
Shenhua Guoneng (Shendong Power) Group
MHPS Dongfang Boiler Co,.LTD
School of Energy Power and Mechanical Engineering, North China Electric Power University
0