您当前的位置:
首页 >
文章列表页 >
TECHNICAL RETROFIT OF A 410t/h CFB BOILER AT GAOBA POWER PLANT OF NEIJIANG CITY, SICHUAN PROVINCE
Thermal Power Generation   Issue 6, Pages: 34-35(2001)
更新时间:2025-09-28
    • TECHNICAL RETROFIT OF A 410t/h CFB BOILER AT GAOBA POWER PLANT OF NEIJIANG CITY, SICHUAN PROVINCE

    • DOI:10.19666/j.rlfd.2001.06.009    

      CLC: TK229.6
    • Published:2001

    移动端阅览

  • TECHNICAL RETROFIT OF A 410t/h CFB BOILER AT GAOBA POWER PLANT OF NEIJIANG CITY, SICHUAN PROVINCE[J]. Thermal Power Generation, 2001, (6): 34-35. DOI: 10.19666/j.rlfd.2001.06.009.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

80

下载量

0

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

Experimental study on banked fire for peak regulation of supercritical circulating fluidized bed units
Simulation of variable-load characteristics of a supercritical circulating fluidized bed boiler
Experimental study on start-stop peak regulation of a 350 MW supercritical circulating fluidized bed coal-fired power unit
Economic research on desulfurization and denitration for a supercritical 350 MW circulating fluidized bed boiler
A STUDY OF OPERATIONAL PERFORMANCE FOR CFB BOILERS

Related Author

佟博恒
李玉
马乐乐
许永伟
赵彬彬
杨军
杨雪婷
李金晶

Related Institution

Shenhua Guoneng (Shendong Power) Group
Huazhong University of Science and Technology
Guodian Thermal Power Research Institute
Guodian Thermal Power Research Institute
Qingshan Thermal Power Plant
0