您当前的位置:
首页 >
文章列表页 >
TEST OF THE RUNBACK FUNCTION IN A THERMAL POWER PLANT
Thermal Power Generation   Issue 5, Pages: 67-69(2002)
更新时间:2025-09-28
    • TEST OF THE RUNBACK FUNCTION IN A THERMAL POWER PLANT

    • DOI:10.19666/j.rlfd.2002.05.022    

      CLC: TK323
    • Published:2002

    移动端阅览

  • TEST OF THE RUNBACK FUNCTION IN A THERMAL POWER PLANT[J]. Thermal Power Generation, 2002, (5): 67-69. DOI: 10.19666/j.rlfd.2002.05.022.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

51

下载量

0

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

STUDY ON APPLICATION DOMAIN OF FF AND PROFIBUS FIELD BUS IN ENGINEERING OF THERMAL POWER PLANTS
Experimental study on circulating water treatment in coal-fired power plants using Nanofiltration process
Numerical simulation on optimization for MGGH flue in thermal power plants
Reliability state identification for key auxiliary equipments in thermal power units
Control strategy for automatic parallel operation of feed water pumps in a 630 MW coal-fired unit

Related Author

崔逸群
颜渝坪
王春利
丁伟
董芳
周斌
傅望安
LI Yajuan

Related Institution

Xi'an Thermal Power Research Institute Co., Ltd
Huaneng Yuhuan Power Plant
Xi'an Thermal Power Research Institute Co.,Ltd.
Huaneng International Electric Inc.
China Datang Corporation Science and Technology Research Institute Northwest Branch
0