您当前的位置:
首页 >
文章列表页 >
APPLICATION OF DYNAMIC PROGRAMMING ON LOAD DISTRIBUTION OPTIMIZATION AMONG HOME-MADE 300MW GENERATING UNITS
Thermal Power Generation   Issue 6, Pages: 2-4(2002)
更新时间:2025-09-28
    • APPLICATION OF DYNAMIC PROGRAMMING ON LOAD DISTRIBUTION OPTIMIZATION AMONG HOME-MADE 300MW GENERATING UNITS

    • DOI:10.19666/j.rlfd.2002.06.001    

      CLC: TM621.2
    • Published:2002

    移动端阅览

  • APPLICATION OF DYNAMIC PROGRAMMING ON LOAD DISTRIBUTION OPTIMIZATION AMONG HOME-MADE 300MW GENERATING UNITS[J]. Thermal Power Generation, 2002, (6): 2-4. DOI: 10.19666/j.rlfd.2002.06.001.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

260

下载量

30

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

Research and application of data-based optimization technology for operation of denitrification system in utility boilers
PRIMARY FREQUENCY REGULATION PERFORMANCE TEST OF A 300MW FOSSIL-FIRED GENERATING UNIT
COMPARISON AND ANALYSIS OF THERMODYNAMIC PERFORMANCE BEFORE AND AFTER RETROFITTING A 300MW UNIT AT JIANBI POWER PLANT
APPLICATION XDPS400 DISTRIBUTED CONTROL SYSTEM ON NEWLY BUILT 300MW UNITS
ENHANCEMENT OF SAFETY AND ECONOMIC ASPECT FOR HEAT REGENERATIVE SYSTEM OF AN IMPORTED TYPE 300MW UNIT

Related Author

姜龙
李金晶
姚宣
黄中
杨雪婷
诸育枫
宋云畅
李媛园

Related Institution

Jianbi Power Plant
Shenzhen West Electric Power Co., Ltd
Mawan Power Plant
The Pearl River Power Plant Guangzhou
Fujian Electric Power Test and Research Institute Fuzhou
0