您当前的位置:
首页 >
文章列表页 >
GUIDING SYSTEM OF OPTIMATION BASED ON Internet/Intranet PROGRAMMING FOR LOW NOx COMBUSTION IN BOILERS OF THERMAL POWER PLANT
Thermal Power Generation   Issue 2, Pages: 8-11(2003)
更新时间:2025-09-28
    • GUIDING SYSTEM OF OPTIMATION BASED ON Internet/Intranet PROGRAMMING FOR LOW NOx COMBUSTION IN BOILERS OF THERMAL POWER PLANT

    • DOI:10.19666/j.rlfd.2003.02.003    

      CLC: TK39
    • Published:2003

    移动端阅览

  • GUIDING SYSTEM OF OPTIMATION BASED ON Internet/Intranet PROGRAMMING FOR LOW NOx COMBUSTION IN BOILERS OF THERMAL POWER PLANT[J]. Thermal Power Generation, 2003, (2): 8-11. DOI: 10.19666/j.rlfd.2003.02.003.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

199

下载量

21

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

COMBUSTION OPTIMIZATION MODELLING FOR UTILITY BOILERS BASED ON GENERALIZED DYNAMIC FUZZY NEURAL NETWORKS
APPLICATION OF CLOSED-LOOP COMBUSTION-OPTIMIZING CONTROL TECHNOLOGY ON 600 MW THERMAL POWER UNIT
Combustion optimization for low NOx-emission based on slippage distinguishing algorithm
STUDY ON COMBUSTIONOPTIMIZING AND AUTOMATIC CONTROL SYSTEM FOR 670 t/h BOILER AND APPLICATION THEREOF
ANALYSIS ABOUT INFLUENCE OF FLUE GAS DENITRIFICATION SYSTEM UPON BOILER OPERATION IN THERMAL POWER PLANT

Related Author

ZHAO Min
YAN Wen-jun
ZHENG JunCollege of Electrical Engineering
DONG Jianxun1
ZHANG Haifu1
MA Zhijie2
GAO Demin1
YANG Hui1

Related Institution

School of Electrical Engineering, Zhejiang University
China Power Investment Mengdong Energy Group Co., Ltd
Northeast Electric Power Research Institute Co., Ltd
State Key Laboratory of Coal Combustion, Huazhong University of Science and Technology
Jiaozuo Power Plant
0