您当前的位置:
首页 >
文章列表页 >
ANALYSIS OF TRIAL OPERATION RELATING TO FEED-WATER PUMPS OF 300 MW UNIT IN GUANG'AN POWER PLANT
Thermal Power Generation   Issue 4, Pages: 55-56(2003)
更新时间:2025-09-28
    • ANALYSIS OF TRIAL OPERATION RELATING TO FEED-WATER PUMPS OF 300 MW UNIT IN GUANG'AN POWER PLANT

    • DOI:10.19666/j.rlfd.2003.04.020    

      CLC: TH31
    • Published:2003

    移动端阅览

  • PENG Yi. ANALYSIS OF TRIAL OPERATION RELATING TO FEED-WATER PUMPS OF 300 MW UNIT IN GUANG'AN POWER PLANT[J]. Thermal Power Generation, 2003, (4): 55-56. DOI: 10.19666/j.rlfd.2003.04.020.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

46

下载量

1

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

Analysis and optimization on run back control strategy for unit with CFB boiler
Practical application and technical discussions of the first set of 1 000 MW domestic full-capacity feed pump unit
PRIMARY FREQUENCY REGULATION PERFORMANCE TEST OF A 300MW FOSSIL-FIRED GENERATING UNIT
COMPARISON AND ANALYSIS OF THERMODYNAMIC PERFORMANCE BEFORE AND AFTER RETROFITTING A 300MW UNIT AT JIANBI POWER PLANT
APPLICATION XDPS400 DISTRIBUTED CONTROL SYSTEM ON NEWLY BUILT 300MW UNITS

Related Author

WANG Fei
HE Jinqi Northwest Power Construction Commissioning Institute
崔志勇
尚卫军
安宗武
胡永海
江飞
姜宏伟

Related Institution

Northwest Electric Power Construction and Debugging Research Institute
Jianbi Power Plant
Shenzhen West Electric Power Co., Ltd
Mawan Power Plant
0