您当前的位置:
首页 >
文章列表页 >
ANALYSIS OF RELIABILITY-ENHANCING IN START-UP COMMISSIONING OF A COMPLETE HOME-MADE 125MW TURBO-GENERATOR SET
Thermal Power Generation   Issue 7, Pages: 7-9(2003)
更新时间:2025-09-28
    • ANALYSIS OF RELIABILITY-ENHANCING IN START-UP COMMISSIONING OF A COMPLETE HOME-MADE 125MW TURBO-GENERATOR SET

    • DOI:10.19666/j.rlfd.2003.07.002    

      CLC: TM31
    • Published:2003

    移动端阅览

  • ANALYSIS OF RELIABILITY-ENHANCING IN START-UP COMMISSIONING OF A COMPLETE HOME-MADE 125MW TURBO-GENERATOR SET[J]. Thermal Power Generation, 2003, (7): 7-9. DOI: 10.19666/j.rlfd.2003.07.002.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

53

下载量

1

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

Fieldbus commissioning method and problem handling for coal-fired power plants
LOW LOAD OPERATION AND ECONOMIC ANALYSIS OF 125MW STEAM TURBINE
DEBUGGING OF A 1025t/h WSHAPED FLAME BOILER IN SHAOGUAN POWER PLANT
ANALYSIS OF A BURNINEG ACCIDENT IN CONSTRUCTION DEBUGGING FOR ONE UTILITY BOILER AND PREVENTING MEASURES THEREOF
CAUSE ANALYSIS OF HIGHER MAIN STEAM TEMPERATURE DURING ROTATION-IMPULSING TO START UP 600 MW SUPERCRITICAL UNIT AND ADOPTED MEASURES

Related Author

GAO Kui
CHEN Kun
TAN Xiangshuai
陈吉荣
李新民
雷如意
岑可法
李乃钊

Related Institution

Xi'an Thermal Power Research Institute Co.,Ltd.
Hancheng
Hancheng Power Plant Shaanxi Hancheng
Hancheng Power Plant
Zhejiang University
0