CAUSE ANALYSIS OF SHAFT-PACKING LEAKAGE AND UNSMOOTHLY CLOGGING OF ROTARY DIAPHRAGM FOR C12-35/10 TYPE STEAM TURBINE, AS WELL AS RETROFITTING THEREOF
Thermal Power Generation   Issue 8, Pages: 67-68(2003)
更新时间:2025-09-28
    • CAUSE ANALYSIS OF SHAFT-PACKING LEAKAGE AND UNSMOOTHLY CLOGGING OF ROTARY DIAPHRAGM FOR C12-35/10 TYPE STEAM TURBINE, AS WELL AS RETROFITTING THEREOF

    • DOI:10.19666/j.rlfd.2003.08.024    

      CLC: TK267
    • Published:2003

    移动端阅览

  • CAUSE ANALYSIS OF SHAFT-PACKING LEAKAGE AND UNSMOOTHLY CLOGGING OF ROTARY DIAPHRAGM FOR C12-35/10 TYPE STEAM TURBINE, AS WELL AS RETROFITTING THEREOF[J]. Thermal Power Generation, 2003, (8): 67-68. DOI: 10.19666/j.rlfd.2003.08.024.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

105

下载量

0

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

ADJUSTMENT OF FRONT BEARING BOX AND ROTOR'S UPLIFT DEGREE FOR STEAM TURBINE NO.4 AT THERMAL POWER PLANT UNDER QILU PETROCHEMICAL INC
CAUSE ANALYSIS AND REMEDICAL MEASURES OF LARGER DIFFERENTIAL EXPANSION FOR UNIT NO.4 IN HUANGTAI POWER PLANT
FEATURES AND PERFORMANCE OF ULTRA-SUPERCRITICAL 660MW STEAM TURBINES
Optimization calculation for sliding pressure of steam turbine with extraction for heating
LVDT faults auto-monitoring technology for turbine governing valve based on video processing

Related Author

龙珍波
翟永惠
王福谭
胥学峰
於长江
GU Yi Huaneng Shanghai Shidongkou Power Plant No.2
WEN Le
YANG Xinmin

Related Institution

Qilu Petrochemical Thermal Power Plant
Huangtai Power Plant
Huaneng Shanghai Shidongkou Second Power Plant
0