您当前的位置:
首页 >
文章列表页 >
MAIN PROBLEMS EXISTING IN THE ONSERVICE ELECTRIC PRECIPITATORS AT COALFIRED POWER PLANTS AND COUNTERMEASURES THEREOF
Thermal Power Generation   Issue 11, Pages: 13-17(2003)
更新时间:2025-09-28
    • MAIN PROBLEMS EXISTING IN THE ONSERVICE ELECTRIC PRECIPITATORS AT COALFIRED POWER PLANTS AND COUNTERMEASURES THEREOF

    • DOI:10.19666/j.rlfd.2003.11.006    

      CLC: TM621.73
    • Published:2003

    移动端阅览

  • MAIN PROBLEMS EXISTING IN THE ONSERVICE ELECTRIC PRECIPITATORS AT COALFIRED POWER PLANTS AND COUNTERMEASURES THEREOF[J]. Thermal Power Generation, 2003, (11): 13-17. DOI: 10.19666/j.rlfd.2003.11.006.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

203

下载量

23

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

TROUBLESOME PROBLEMS EXISTING IN ELETROSTATIC PRECIPITATORS AT ZHUJIANG POWER PLANT AND IMPROVEMENT MEASURES THEREOF
SIMULATION TEST STUDY AND APPLICATION OF A COMBINED DUST-ELIMINATING MODE BEING COMPOSED OF ELECTRIC PRECIPITATOR AND VENTURI WATER FILM SCRUBBER
ELEMENTARY STUDY ON CFD METHOD FOR GAS-FLOW DISTRIBUTION OF ELECTROSTATIC PRECIPITATORS
AN APPROACH TO PROBLEM OF CORRECTING DUST REMOVAL EFFICIENCY FOR ELETROSTATIC PRECIPITATORS
TEST STUDY ON EMISSION CONTROL OF ABSORBABLE PARITCLES INTO ELECTROSTATIC PRECIPITATORS FOR 300 MW UNIT

Related Author

WANG Yun-chi
李广建
李广民
党小庆
袁胜利
杨春方
马广大
ZHANG Bin-wei

Related Institution

The Pearl River Power Plant Guangzhou
Pingdingshan Coal Industry Group Kengkou Power Plant
Xi'an University of Architecture and Technology, Xi'an University of Architecture and Technology, Xi'an University of Architecture and Technology, Xi'an University of Architecture and Technology, Shaanxi Xi'an 710055, Shaanxi Xi'an 710055, Shaanxi Xi'an 710055
0