您当前的位置:
首页 >
文章列表页 >
TEST AND STUDY ON TUBE-WALL OVER-TEMPERATURE PROBLEM DURING THE START-UP COURSE OF PULVERIZING MILLS
Thermal Power Generation   Issue 12, Pages: 16-18(2003)
更新时间:2025-09-28
    • TEST AND STUDY ON TUBE-WALL OVER-TEMPERATURE PROBLEM DURING THE START-UP COURSE OF PULVERIZING MILLS

    • DOI:10.19666/j.rlfd.2003.12.006    

      CLC: TK223.25
    • Published:2003

    移动端阅览

  • YANG Xiang- hang. TEST AND STUDY ON TUBE-WALL OVER-TEMPERATURE PROBLEM DURING THE START-UP COURSE OF PULVERIZING MILLS[J]. Thermal Power Generation, 2003, (12): 16-18. DOI: 10.19666/j.rlfd.2003.12.006.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

58

下载量

1

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

RETROFIT OF PLATEN SUPERHEATER FOR CFB BOILERS
A fault diagnosis method for coal mills based on Bayesian network under imbalanced data conditions
Optimization and reconstruction of superheater and reheater for a 1 000 MW tower type boiler with double-reheat cycle
Type selection of coal pulverizing system for 660 MW coal-fired boiler burning semi-coke
Temperature independent control for direct-firing pulverizing system

Related Author

WANG Yingdong1
SUN Yong1
JIANG Jianzhong2
ZHANG Xiuru1
GUO Xinhai1
L Hongqi1
LIU Xiaopeng21.Huadian Lu'an Power Generation Co Ltd
张涛

Related Institution

Huadian Lu'an Power Generation Co., Ltd
Xi'an Thermal Power Research Institute Co., Ltd
Xi’an Thermal Power Research Institute Co., Ltd.
Xi'an Thermal Power Research Institute Co.,Ltd.
Huangshi Power Plant,Huadian Corporation Hubei Branch
0