您当前的位置:
首页 >
文章列表页 >
TEST METHOD FOR PERIODIC PERFORMANCE MONITORING OF LARGESCALE CONDENSING STEAM TURBINES
Thermal Power Generation   Issue 1, Pages: 48-51(2004)
更新时间:2025-09-28
    • TEST METHOD FOR PERIODIC PERFORMANCE MONITORING OF LARGESCALE CONDENSING STEAM TURBINES

    • DOI:10.19666/j.rlfd.2004.01.015    

      CLC: TK267
    • Published:2004

    移动端阅览

  • TANG Xiaoni. TEST METHOD FOR PERIODIC PERFORMANCE MONITORING OF LARGESCALE CONDENSING STEAM TURBINES[J]. Thermal Power Generation, 2004, (1): 48-51. DOI: 10.19666/j.rlfd.2004.01.015.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

97

下载量

3

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

Analysis and optimization for online operation performance indexes of the ultra supercritical 1 000 MW double-reheat unit in Laiwu Power Plant
Evaluation methods for turbine steam seal retrofitting
Thermal-economic analysis for scheme of steam turbine generator placement in high and low platform separately
Influence of measurement and estimation of heat loss on efficiency of CFB boiler
Overall economical performance of 1 000 MW class ultra-supercritical unit with double-reheat cycle

Related Author

WU Tao
CHU Mo
MA Pengbo
WANG Tao
WANG Zhiwei
MA Liran
LIU Zhicheng
FU Chang

Related Institution

Huaneng Laiwu Power Generation Co., Ltd.
Xi’an Thermal Power Research Institute Co., Ltd.
Xi'an Thermal Power Research Institute Co.,Ltd.
Xi’an Thermal Power Research Institute Co., Ltd.
Jining Branch of Shandong Special Equipment Inspection Institute
0