您当前的位置:
首页 >
文章列表页 >
RETROFITTING OF HEADER HAND-HOLES FOR A 130 t/h BOILER IN HUATING POWER PLANT
Thermal Power Generation   Issue 3, Pages: 64-65(2004)
更新时间:2025-09-28
    • RETROFITTING OF HEADER HAND-HOLES FOR A 130 t/h BOILER IN HUATING POWER PLANT

    • DOI:10.19666/j.rlfd.2004.03.021    

      CLC: TK228
    • Published:2004

    移动端阅览

  • RETROFITTING OF HEADER HAND-HOLES FOR A 130 t/h BOILER IN HUATING POWER PLANT[J]. Thermal Power Generation, 2004, (3): 64-65. DOI: 10.19666/j.rlfd.2004.03.021.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

43

下载量

0

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

ANALYSIS OF AND STUDY ON RETROFIT AND APPLICATION RESULT OF ECONOMIZER IN THERMAL POWER PLANT
Typical faults and countermeasures of flue gas cooler for coal-fired boilers
Application of low-grade energy heating technology in central heating by cogeneration
Thermal fatigue failure analysis for drainage-tank in hot section of reheat pipeline in an ultra supercritical 1 000 MW unit
Study and realization of transforming induced draft fans with adjustable stator blades into ones with adjustable rotor blades in a 600 MW unit

Related Author

张子敬
王清华
张金荣
吕忠义
王胜捷
胡芳芳
任纪云
邓磊

Related Institution

Inner Mongolia University of Technology
School of Energy Power, Shanxi University
School of Automation, Shanxi University
Jiajie Gas Thermal Power Plant, Jinneng Group Co., Ltd.
Zhejiang Zhoushan Coal-based Power Co., Ltd.
0