您当前的位置:
首页 >
文章列表页 >
OPERATION PRACTICE OF CANADAMADE BW1190t/h BOILER AND STUDY ON COUNTEMEASURES FOR PERFORMANCE IMPROVEMENT THEREOF
Thermal Power Generation   Issue 4, Pages: 7-9(2004)
更新时间:2025-09-28
    • OPERATION PRACTICE OF CANADAMADE BW1190t/h BOILER AND STUDY ON COUNTEMEASURES FOR PERFORMANCE IMPROVEMENT THEREOF

    • DOI:10.19666/j.rlfd.2004.04.002    

      CLC: TK227
    • Published:2004

    移动端阅览

  • SHEN Qi. OPERATION PRACTICE OF CANADAMADE BW1190t/h BOILER AND STUDY ON COUNTEMEASURES FOR PERFORMANCE IMPROVEMENT THEREOF[J]. Thermal Power Generation, 2004, (4): 7-9. DOI: 10.19666/j.rlfd.2004.04.002.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

40

下载量

0

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

RETROFITTING OF WATER-LEVEL CONTROL SYSTEM FOR HIGHPRESSURE HEATER OF 350MW UNITS
PREVENTION OF SLAGGING IN BOILERS AND RETROFITTING HORIZONTARL RICH/LEAN BURNERS THEREOF
TEST STUDY ON OUTLET FLOW FIELD PERFORMANCE FROM WAVE-SHAPED COMBUSTION-STABILIZING BODY OF THE CONCENTRATION TUNABLE RICH/LEAN BURNERS
CAUSE ANALYSIS OF HIGH TEMPERATURE CORROSION OCCURRED ON THE WATER-WALL AND RESOLUTION MEASURES THEREOF
CAUSE ANALYSIS OF SLAGGING IN BABCOCK 2209 t/h BOILERS MADE IN GERMANY AND PREVENTION THEREOF

Related Author

HU Min
LIU Chengliang
CHEN Linghong
CHI Zuohe
CENG Kefa
ZHANG Guo-bing
LIANG Gui-long
LI Hu

Related Institution

Hepo Power Generation Co., Ltd
Zhejiang University
Hejin Power Plant
Huaneng Dezhou Power Plant
0