您当前的位置:
首页 >
文章列表页 >
DESIGN FOR RETROFITTING ECONOMIZER OF A 670t/h PULVERIZED COAL BOILER
Thermal Power Generation   Issue 4, Pages: 40-44(2004)
更新时间:2025-09-28
    • DESIGN FOR RETROFITTING ECONOMIZER OF A 670t/h PULVERIZED COAL BOILER

    • DOI:10.19666/j.rlfd.2004.04.012    

      CLC: TK223.2
    • Published:2004

    移动端阅览

  • DESIGN FOR RETROFITTING ECONOMIZER OF A 670t/h PULVERIZED COAL BOILER[J]. Thermal Power Generation, 2004, (4): 40-44. DOI: 10.19666/j.rlfd.2004.04.012.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

290

下载量

7

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

Modelling for unburned carbon content in fly ash from coal-fired boilers based on adaptive neuro-fuzzy inference system
Modeling and simulation of economizer based on system dynamics
Numerical simulation on dynamic performance of combustion and flue gas system in a 300 MW oxy-coal fired boiler
Countermeasures for SCR denitration system of coal-fired unit during low-load operation
Study on installation of high-temperature heat exchanger for a 1 100 t/h tower type boiler

Related Author

CHI Yong
YAN Jianhua
尤海辉
唐义军
沈跃良
倪明江
池 涌
严建华

Related Institution

Electric Power Research Institute of Guangdong Power Grid Corporation,Ltd.
State Key Laboratory of Clean Energy Utilization, Zhejiang University
School of Control and Computer Engineering, North China Electric Power University
School of Energy Power and Mechanical Engineering, North China Electric Power University
School of Energy & Environment,Southeast University
0