您当前的位置:
首页 >
文章列表页 >
STUDY ON PROBLEMS OF SCALING AND CLOGGING IN WET CALCIUM FLUE GAS DESULFURATION FACILITY OF MEDIUM-AND SMAL-LSCALE INDUSTRIAL BOILERS
Thermal Power Generation   Issue 6, Pages: 31-34(2004)
更新时间:2025-09-28
    • STUDY ON PROBLEMS OF SCALING AND CLOGGING IN WET CALCIUM FLUE GAS DESULFURATION FACILITY OF MEDIUM-AND SMAL-LSCALE INDUSTRIAL BOILERS

    • DOI:10.19666/j.rlfd.2004.06.008    

      CLC: TK227
    • Published:2004

    移动端阅览

  • STUDY ON PROBLEMS OF SCALING AND CLOGGING IN WET CALCIUM FLUE GAS DESULFURATION FACILITY OF MEDIUM-AND SMAL-LSCALE INDUSTRIAL BOILERS[J]. Thermal Power Generation, 2004, (6): 31-34. DOI: 10.19666/j.rlfd.2004.06.008.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

196

下载量

5

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

PERFORMANCE TEST AND TECHNICAL ANALYSIS OF NEW TYPE LIQUIDCOLUMN INJECTING DESULPHURIZATION TECHNOLOGY
Economic research on desulfurization and denitration for a supercritical 350 MW circulating fluidized bed boiler
Formation mechanisms and block reason analysis for deposition in ammonia transportation pipeline of ammonia station in a power plant
Ultra-low emission reform and its influence on the plant’s electricity supply cost

Related Author

黄斌
姚强
项光明
李水清
张贞良
WANG Lin
GAO Jihui
CHE Hongwei

Related Institution

Tsinghua Tongfang Energy and Environment Co., Ltd.
Tsinghua University
School of Energy Science and Engineering, Harbin Institute of Technology
Xi’an Thermal Power Research Institute Co., Ltd.
Shenhua Guoneng (Shendong Power) Group
0