您当前的位置:
首页 >
文章列表页 >
STATE INSPECTION AND RISK EVALUATION FOR THE WATER WALL OF BOILERS
Thermal Power Generation   Issue 7, Pages: 7-9(2004)
更新时间:2025-09-28
    • STATE INSPECTION AND RISK EVALUATION FOR THE WATER WALL OF BOILERS

    • DOI:10.19666/j.rlfd.2004.07.003    

      CLC: TM621.3
    • Published:2004

    移动端阅览

  • STATE INSPECTION AND RISK EVALUATION FOR THE WATER WALL OF BOILERS[J]. Thermal Power Generation, 2004, (7): 7-9. DOI: 10.19666/j.rlfd.2004.07.003.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

144

下载量

14

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

Operation adjustment for high temperature corrosion in water wall of supercritical opposed firing boiler
Fouling monitoring and intelligent sootblowing control technologies for coal-fired boilers
Water wall temperature deviation of an ultra-supercritical 1 000 MW unit boiler: analysis and countermeasures
Influencing factors of reducing gas in water wall area of a 600 MW unit boiler
Computational analysis on hydrodynamic characteristics and flow instability of an ultra supercritical 1 000 MW double-reheat unit boiler

Related Author

ZHOU Ke
SHE Yuanyuan
LU Fen
LI Jianshe
CHEN Junbin
ZHOU Junbo
CHEN Xiaowen
GAO Haidong

Related Institution

Xi'an Thermal Power Research Institute Co.,Ltd.
Fujian Hongshan Cogeneration Power Co.,Ltd.,Shishi
Xi’an Thermal Power Research Institute Co., Ltd.
Huanghe Hydropower Development Co., Ltd.
国家电投集团河南电力有限公司技术信息中心
0