您当前的位置:
首页 >
文章列表页 >
PROBLEMS NEEDING ATTENTION IN ELECTRIC PRECIPITOTOR DESIGN FOR COALFIRING POWER PLANT
Thermal Power Generation   Issue 9, Pages: 4-6(2004)
更新时间:2025-09-28
    • PROBLEMS NEEDING ATTENTION IN ELECTRIC PRECIPITOTOR DESIGN FOR COALFIRING POWER PLANT

    • DOI:10.19666/j.rlfd.2004.09.002    

      CLC: TM621
    • Published:2004

    移动端阅览

  • QI Juntian. PROBLEMS NEEDING ATTENTION IN ELECTRIC PRECIPITOTOR DESIGN FOR COALFIRING POWER PLANT[J]. Thermal Power Generation, 2004, (9): 4-6. DOI: 10.19666/j.rlfd.2004.09.002.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

292

下载量

15

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

DESIGN AND APPLICATION OF CONTROL SYSTEM FOR ELECTROSTATIC PRECIPITATOR
APPLICATION OF SONIC SOOT-BLOWERS WITH VARYING AUDIO-FREQUENCY ON ELECTROSTATIC PRECIPITATOR
TEST STUDY ON OPTIMIZATION OF ELECTRIC FIELD PERFORMANCE FOR ELECTROSTATIC PRECPITATOR BY USING FINITE ELEMENT METHOD
STUDY ON APPLICATION OF COMBINED DUST REMOVAL TECHNOLOGY USING ELECTROSTATIC PRECIPITATOR AND BAG FILTER FOR CFB BOILER
STUDY ON DISTRIBUTION BEHAVIOR OF GAS FLOW IN THE INWARDING BAG TYPE DUST COLLECTOR

Related Author

WU Bao-jing
ZAI Jing-bo (Mine Mouth Power Plant under Pingdingshan Coal Group
XIONG Quan-ju
SONG Guang-hui
SHI Zhong-xin
HAN Xiao-mei
DANG Xiao-qing
YANG Ding

Related Institution

Fujian Longjing Environmental Protection Co., Ltd
Pingmei Group Kengkou Power Plant
Xi'an University of Architecture and Technology
Xi'an Thermal Power Research Institute Co., Ltd
Hebei Electric Power Research Institute
0