AN APPROACH TO ADOPTING NEW TECHNOLOGY OF THERMODYNAMIC CYCLE FOR LOWPRESSURE CYLINDER FOR 300 MW STEAM TURBINE IN XUANWEI POWER PLANT
Thermal Power Generation   Issue 2, Pages: 57-59(2005)
更新时间:2025-09-28
    • AN APPROACH TO ADOPTING NEW TECHNOLOGY OF THERMODYNAMIC CYCLE FOR LOWPRESSURE CYLINDER FOR 300 MW STEAM TURBINE IN XUANWEI POWER PLANT

    • DOI:10.19666/j.rlfd.2005.02.019    

      CLC: TK261
    • Published:2005

    移动端阅览

  • ZHAN Yuxin. AN APPROACH TO ADOPTING NEW TECHNOLOGY OF THERMODYNAMIC CYCLE FOR LOWPRESSURE CYLINDER FOR 300 MW STEAM TURBINE IN XUANWEI POWER PLANT[J]. Thermal Power Generation, 2005, (2): 57-59. DOI: 10.19666/j.rlfd.2005.02.019.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

98

下载量

4

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

Performance analysis of organic Rankine cycle for power recovery from geothermal energy
Effect of improving reheat steam temperature on boiler thermal performance and economic analysis
Simulation study on supercritical carbon dioxide thermal power system
Optimization of reheat pressure for double-reheat unit using EC thermal system
Simulation analysis on performance of supercritical carbon dioxide recompression intercooling split-flow solar power system

Related Author

YANG Yongping
YANG Lijun
DU Xiaoze
GUO Cong
CHE Defu
QIN Dachuan
WU Song
SUN Ke

Related Institution

Key Laboratory of Power Station Equipment Status Monitoring and Control, Ministry of Education, North China Electric Power University
School of Energy and Power Engineering, Xi'an Jiaotong University
Huadian Electric Power Research Institute
Xi'an Thermal Power Research Institute Co., Ltd
Shanghai Electric Power Station Equipment Co., Ltd. Shanghai Turbine Factory
0