MODERNIZED RETROFIT OF FLOW PASSAGE FOR 200 MW STEAM TURBINE IN SHENGLI POWER PLANT AND ECONOMIC BEHAVIOR ANALYSIS THEREOF
Thermal Power Generation   Issue 3, Pages: 42-44(2005)
更新时间:2025-09-28
    • MODERNIZED RETROFIT OF FLOW PASSAGE FOR 200 MW STEAM TURBINE IN SHENGLI POWER PLANT AND ECONOMIC BEHAVIOR ANALYSIS THEREOF

    • DOI:10.19666/j.rlfd.2005.03.015    

      CLC: TK262
    • Published:2005

    移动端阅览

  • YU Peng, YE Tao. MODERNIZED RETROFIT OF FLOW PASSAGE FOR 200 MW STEAM TURBINE IN SHENGLI POWER PLANT AND ECONOMIC BEHAVIOR ANALYSIS THEREOF[J]. Thermal Power Generation, 2005, (3): 42-44. DOI: 10.19666/j.rlfd.2005.03.015.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

150

下载量

3

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

Analysis and optimization for online operation performance indexes of the ultra supercritical 1 000 MW double-reheat unit in Laiwu Power Plant
Evaluation methods for turbine steam seal retrofitting
Thermal-economic analysis for scheme of steam turbine generator placement in high and low platform separately
Overall economical performance of 1 000 MW class ultra-supercritical unit with double-reheat cycle
Simplified calculation method for economical indexes of heating units

Related Author

WU Tao
CHU Mo
MA Pengbo
WANG Tao
WANG Zhiwei
MA Liran
LIU Zhicheng
FU Chang

Related Institution

Huaneng Laiwu Power Generation Co., Ltd.
Xi’an Thermal Power Research Institute Co., Ltd.
Xi'an Thermal Power Research Institute Co.,Ltd.
Xi’an Thermal Power Research Institute Co., Ltd.
Xi’an Electric Power College
0