您当前的位置:
首页 >
文章列表页 >
ANALYSIS OF TURBINE-BOILER COORDINATED CONTROL AND AGC SYSTEM IN YANGLUO POWER PLANT
Thermal Power Generation   Issue 3, Pages: 51-54(2005)
更新时间:2025-09-28
    • ANALYSIS OF TURBINE-BOILER COORDINATED CONTROL AND AGC SYSTEM IN YANGLUO POWER PLANT

    • DOI:10.19666/j.rlfd.2005.03.018    

      CLC: TK32
    • Published:2005

    移动端阅览

  • WANG Zhen, LI De-shi, CHEN Min. ANALYSIS OF TURBINE-BOILER COORDINATED CONTROL AND AGC SYSTEM IN YANGLUO POWER PLANT[J]. Thermal Power Generation, 2005, (3): 51-54. DOI: 10.19666/j.rlfd.2005.03.018.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

146

下载量

0

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

PRACTICE OF CHANGING FEED-WATER TREATMENT MODE FOR 300 MW UNIT IN HEZE POWER PLANT FROM AVT(R) INTO AVT(O)
CAUSES LEADING TO ABNORMALITY IN MEASUREMENT USING DRUM-LEVEL GAUGE IN ZHUNGE’R POWER PLANT
CAUSE ANALYSIS OF CORROSION FOR CHEMICAL-DOSING TUBE ENTERING INTO THE DRUM PORT
EXPLOSION PREVENTING RETROFIT AND OPERATION MEASURES FOR COAL PULVERIZING SYSTEM IN DAGANG POWER PLANT
EXPERIENCE DEALING WITH THE FAST CUT BACK OF 600MW SUPECRITICAL UNITS

Related Author

LI Xiu-juan Heze Power Plant
CHANG Shi-ji
ZHANG Cuihong
LIU Qiang
CHEN Hao
WANG LeiMid China University of Science and Technology
HUANG Shu-hong
ZHANG Xiao-ling

Related Institution

Heze Power Plant
Zhungeer Power Plant Hohhot
Shengli Power Plant Dongying
Beijing Jiaotong University Beijing
Huaneng Shanghai Shidongkou Second Power Plant
0