AN APPROACH TO SCHEME OF DESULFURATION SYSTEM WITHOUT INSTALLATION OF GASGAS HEATER IN POWER PLANTS
Thermal Power Generation   Issue 10, (2005)
更新时间:2025-09-28
    • AN APPROACH TO SCHEME OF DESULFURATION SYSTEM WITHOUT INSTALLATION OF GASGAS HEATER IN POWER PLANTS

    • DOI:10.19666/j.rlfd.2005.10.001    

      CLC: X701.3
    • Published:2005

    移动端阅览

  • ZHAO Hua, LAI Min, DING Jingwei. AN APPROACH TO SCHEME OF DESULFURATION SYSTEM WITHOUT INSTALLATION OF GASGAS HEATER IN POWER PLANTS[J]. Thermal Power Generation, 2005, (10). DOI: 10.19666/j.rlfd.2005.10.001.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

144

下载量

11

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

Research on comprehensive performance of combustion chamber of blast-furnace-gas-fired gas turbine
Experimental study on direct co-combustion of biomass cow manure in a 660 MW coal-fired unit
Double-objective heat and power dispatch based on lexicographic optimization method and ??-constraint technique
Experimental study on combustion characteristics of a new biomass fuel blended with small proportion of pulverized coal
Application of improved k-means algorithm in optimal operation of power plant

Related Author

郑玮琳
代佳奇
宋雪松
卫翔
潘腾
田亚钊
律景春
赵旭

Related Institution

School of Electrical Engineering, Guangxi University
Electric Power Research Institute of Guangxi Power Grid Co., Ltd.
Institute of Mechanics, Chinese Academy of Sciences (CAS)
East China Electric Power Design Institute Co., Ltd.
Huadian Electric Power Research Institute
0