COMPARISON BETWEEN SCHEME OF ONE BOILER WITH ONE ABSORPTION TOWER AND THAT OF TWO BOILERS WITH ONE TOWER IN DESULFURATION PROJECTS FOR 300 MW COALFIRED UNIT
Thermal Power GenerationIssue 10, (2005)
更新时间:2025-09-28
分享给微信好友或者朋友圈
导出参考文献
COMPARISON BETWEEN SCHEME OF ONE BOILER WITH ONE ABSORPTION TOWER AND THAT OF TWO BOILERS WITH ONE TOWER IN DESULFURATION PROJECTS FOR 300 MW COALFIRED UNIT
RONG Shuqun, SHAO Feng. COMPARISON BETWEEN SCHEME OF ONE BOILER WITH ONE ABSORPTION TOWER AND THAT OF TWO BOILERS WITH ONE TOWER IN DESULFURATION PROJECTS FOR 300 MW COALFIRED UNIT[J]. Thermal Power Generation, 2005, (10).
DOI:
RONG Shuqun, SHAO Feng. COMPARISON BETWEEN SCHEME OF ONE BOILER WITH ONE ABSORPTION TOWER AND THAT OF TWO BOILERS WITH ONE TOWER IN DESULFURATION PROJECTS FOR 300 MW COALFIRED UNIT[J]. Thermal Power Generation, 2005, (10). DOI: 10.19666/j.rlfd.2005.10.002.
COMPARISON BETWEEN SCHEME OF ONE BOILER WITH ONE ABSORPTION TOWER AND THAT OF TWO BOILERS WITH ONE TOWER IN DESULFURATION PROJECTS FOR 300 MW COALFIRED UNIT
and operation cost of titlementioned schemes have been carried out.It is believed from analysis that the scheme of one boiler with one tower to have many advantages
even though its once forever investiment to be higher.However
the operation cost of it is lower than that of scheme for two boilers with one tower
and it can suit the increasingly strict requirements of environmental protection in the future.