您当前的位置:
首页 >
文章列表页 >
ANALYSIS OF AND STUDY ON RETROFIT AND APPLICATION RESULT OF ECONOMIZER IN THERMAL POWER PLANT
Thermal Power Generation   Issue 1, Pages: 41-43(2006)
更新时间:2025-09-28
    • ANALYSIS OF AND STUDY ON RETROFIT AND APPLICATION RESULT OF ECONOMIZER IN THERMAL POWER PLANT

    • DOI:10.19666/j.rlfd.2006.01.012    

      CLC: TK223.33
    • Published:2006

    移动端阅览

  • ANALYSIS OF AND STUDY ON RETROFIT AND APPLICATION RESULT OF ECONOMIZER IN THERMAL POWER PLANT[J]. Thermal Power Generation, 2006, (1): 41-43. DOI: 10.19666/j.rlfd.2006.01.012.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

118

下载量

0

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

Modeling and simulation of economizer based on system dynamics
Countermeasures for SCR denitration system of coal-fired unit during low-load operation
ANALYSIS OF UTILIZING SPIRAL FINNED TUBE BUNDLE FOR ECONOMIZER OF BOILERS
APPLICATION OF ANTIWEAR TECHNOLOGY ON ECONOMIZOR OF CFB BOILERS
TECHNICAL FEATURES AND EXISTING PROBLEMS OF DG 440t/h SUPER HIGH PRESSURE REHEATED CFB BOILER

Related Author

WEI Le
MA Binbin
ZHANG Feiran
ZHOU Keyi
XU Qi
YAO Yushan
刘聿拯
袁益超

Related Institution

School of Control and Computer Engineering, North China Electric Power University
School of Energy & Environment,Southeast University
Shanghai University of Technology
Shanghai University of Technology Shanghai
0