您当前的位置:
首页 >
文章列表页 >
IMPROVEMENT OF LAST STAGE BLADES AND GLANDPACKING FOR 350 MW STEAM TURBINE
Thermal Power Generation   Issue 1, Pages: 67-68(2006)
更新时间:2025-09-28
    • IMPROVEMENT OF LAST STAGE BLADES AND GLANDPACKING FOR 350 MW STEAM TURBINE

    • DOI:10.19666/j.rlfd.2006.01.022    

      CLC: TK263
    • Published:2006

    移动端阅览

  • LI Lingyang, JIN Zhengyi, LIU Zhao. IMPROVEMENT OF LAST STAGE BLADES AND GLANDPACKING FOR 350 MW STEAM TURBINE[J]. Thermal Power Generation, 2006, (1): 67-68. DOI: 10.19666/j.rlfd.2006.01.022.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

137

下载量

0

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

INFLUENCE OF CLEARANCE VARIATION IN FLOW PASSAGE OF STEAM TURBINE UPON THE RELATIVE INTERNAL EFFICIENCY AND POWER
Progress of quantitative evaluation of wetness losses in steam turbine
Fault diagnosis method of turbine flow passage based on on-site thermal parameters and its application

Related Author

ZHOU Yun-long1
CAO Li-hua2
XU Wei1
MENG Fang-qun3
LI Yong11.College of Energy and Power Engineering
HAN Zhonghe
HAN Xu
LI Peng

Related Institution

School of Energy and Power Engineering, Northeast Electric Power University
College of Energy and Power Engineering, North China Electric Power University
Zhangjiakou Power Plant
Key Laboratory of Power Station Equipment Status Monitoring and Control, Ministry of Education, North China Electric Power University
Xi'an Thermal Power Research Institute Co., Ltd
0