您当前的位置:
首页 >
文章列表页 >
CAUSE ANALYSIS OF SOMEWHAT LOW RATE FOR PUTTING HIGH-PRESSURE HEATER OF 200 MW UNITS INTO SERVICE AND RETROFITTING MEASURES THEREOF
Thermal Power Generation   Issue 5, Pages: 38-39(2006)
更新时间:2025-09-28
    • CAUSE ANALYSIS OF SOMEWHAT LOW RATE FOR PUTTING HIGH-PRESSURE HEATER OF 200 MW UNITS INTO SERVICE AND RETROFITTING MEASURES THEREOF

    • DOI:10.19666/j.rlfd.2006.05.012    

      CLC: TK263
    • Published:2006

    移动端阅览

  • HE Dongrong. CAUSE ANALYSIS OF SOMEWHAT LOW RATE FOR PUTTING HIGH-PRESSURE HEATER OF 200 MW UNITS INTO SERVICE AND RETROFITTING MEASURES THEREOF[J]. Thermal Power Generation, 2006, (5): 38-39. DOI: 10.19666/j.rlfd.2006.05.012.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

49

下载量

0

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

CAUSE ANALYSIS OF HIGH-PRESSURE HEATER LEAKAGE FOR 300MW UNIT AND COUNTERMEASURES THEREOF
CAUSE ANALYSIS AND DISPOSAL OF ABNORMAL OPERATION FOR EXTERNALLY ARRANGED STEAM COOLER OF THE HIGH-PRESSURE HEATER
RETROFITTING OF AUXILIARY VALVE FOR SOLENOID BLOWOUT VALVES
ANALYSIS OF SUPERHEATER'S TUBE-BURST CAUSED BY FALLING-AWAY OF OXIDE SKIN
CAUSE ANALYSIS OF LEAKAGE ACCIDENTS FOR “FOUR KINDS OF TUBES” AND COUNTERMEASURES THEREOF

Related Author

CAO Zhi-yang(Huaneng Pinliang Power Generation Co Ltd
ZHANG Qin-chuan
AN Guang-hui
SU Yan-anHuadian Pucheng Power Generation Co Ltd
LUO Sheng
LI Yao-jun
LI Peihua
WU Ping

Related Institution

Huaneng Pingliang Power Generation Co., Ltd
Huadian Pucheng Power Generation Co., Ltd
The Pearl River Power Plant Guangdong
Xi'an Thermal Power Research Institute Co.,Ltd.
Huaibei Power Plant Anhui Huaibei
0