您当前的位置:
首页 >
文章列表页 >
WORKING OUT OF PERFORMANCE TEST CODE FOR CFB BOILERS AND FEATURES THEREOF
Thermal Power Generation   Issue 6, Pages: 14-16(2006)
更新时间:2025-09-28
    • WORKING OUT OF PERFORMANCE TEST CODE FOR CFB BOILERS AND FEATURES THEREOF

    • DOI:10.19666/j.rlfd.2006.06.004    

      CLC: TK229
    • Published:2006

    移动端阅览

  • WORKING OUT OF PERFORMANCE TEST CODE FOR CFB BOILERS AND FEATURES THEREOF[J]. Thermal Power Generation, 2006, (6): 14-16. DOI: 10.19666/j.rlfd.2006.06.004.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

155

下载量

2

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

STUDY ON THE BOTTOM ASH REMOVAL SYSTEM FOR A 410 T/H CFB BOILER MANUFACTURED IN CHINA
DISCUSSION ON DETERMINATION OF CFB BOILER THERMAL EFFICIENCY
Experimental study on banked fire for peak regulation of supercritical circulating fluidized bed units
Simulation of variable-load characteristics of a supercritical circulating fluidized bed boiler
Experimental study on start-stop peak regulation of a 350 MW supercritical circulating fluidized bed coal-fired power unit

Related Author

吕怀安
徐正泉
马丽锦
张敏
孙献斌
何王全
高洪培
王海涛

Related Institution

National Engineering Research Center
National Clean Coal Combustion Project for Power Plant Boilers
Sichuan Provincial Electric Power Industry Bureau
Shenhua Guoneng (Shendong Power) Group
Jining Branch of Shandong Special Equipment Inspection Institute
0