您当前的位置:
首页 >
文章列表页 >
DESIGN,ERRECTION,AND COMMISION DEBUGGING OF 600MW DIRECT AIR-COOLED UNIT PROJECT IN GUODIAN DATONG POWER-GENERATION CO LTD
Thermal Power Generation   Issue 6, Pages: 29-31(2006)
更新时间:2025-09-28
    • DESIGN,ERRECTION,AND COMMISION DEBUGGING OF 600MW DIRECT AIR-COOLED UNIT PROJECT IN GUODIAN DATONG POWER-GENERATION CO LTD

    • DOI:10.19666/j.rlfd.2006.06.009    

      CLC: TM621.3
    • Published:2006

    移动端阅览

  • WU Quan. DESIGN,ERRECTION,AND COMMISION DEBUGGING OF 600MW DIRECT AIR-COOLED UNIT PROJECT IN GUODIAN DATONG POWER-GENERATION CO LTD[J]. Thermal Power Generation, 2006, (6): 29-31. DOI: 10.19666/j.rlfd.2006.06.009.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

162

下载量

4

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

ACC ACCEPTANCE TEST AND ITS ANALYSIS ON A 600 MW UNIT
Influence of air flow field reconstruction inside and outside the air cooling unit on cooling performance of the system
Research of neighbor inter-connection on cold end system of thermal power units
Key points of SNCR denitrification technology for coal fired boilers
Comparative analysis on control algorithm for direct air cooling system of coal fired power plant

Related Author

YANG Hai-sheng1
ZHOU Lan-xin1
LIU Chun-bao2
SHANG Zhong-hua2
LIU Hong-xia1.North China Electric Power University
李旋
李禹江
韩强

Related Institution

College of Energy and Power Engineering, North China Electric Power University
Guodian Longshan Power Generation Co., Ltd
Xi’an TPRI Energy Conservation Technology Co., Ltd.
Huaneng Weihai Power Generation Liability Co., Ltd.
Xi'an Thermal Power Research Institute Co.,Ltd.
0