您当前的位置:
首页 >
文章列表页 >
OPTIMIZATION OF THE RUN BACK FUNCTION OF UNITS IN SECOND-PHASE PROJECT OF HUANENG FUZHOU POWER PLANT
Thermal Power Generation   Issue 6, Pages: 37-39(2006)
更新时间:2025-09-28
    • OPTIMIZATION OF THE RUN BACK FUNCTION OF UNITS IN SECOND-PHASE PROJECT OF HUANENG FUZHOU POWER PLANT

    • DOI:10.19666/j.rlfd.2006.06.012    

      CLC: TM621.3
    • Published:2006

    移动端阅览

  • OPTIMIZATION OF THE RUN BACK FUNCTION OF UNITS IN SECOND-PHASE PROJECT OF HUANENG FUZHOU POWER PLANT[J]. Thermal Power Generation, 2006, (6): 37-39. DOI: 10.19666/j.rlfd.2006.06.012.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

66

下载量

3

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

Genetic algorithm based dynamic sliding mode water level control for steam generators in nuclear power stations
Typical design and reliability analysis on relay circuit of main protection in thermal power units
Preventive maintenance strategy for master fuel trip in thermal power plants

Related Author

ZENG Bifan
WU Jie
WU Wanqiang
XU Zhibin
MA Xiaoqian
LIU Wenfeng
XUN Xin
LIU Hongxu

Related Institution

Guangdong Province Key Laboratory of Efficient and Clean Energy Utilization,South China University of Technology
Hunan Electric Power Company Scientific Research Institute
School of Control and Computer Engineering, North China Electric Power University
0