您当前的位置:
首页 >
文章列表页 >
TYPE AND CAPACITY SELECTION OF BYPASS SYSTEM FOR TURBINE UNITS
Thermal Power Generation   Issue 8, Pages: 12-15(2006)
更新时间:2025-09-28
    • TYPE AND CAPACITY SELECTION OF BYPASS SYSTEM FOR TURBINE UNITS

    • DOI:10.19666/j.rlfd.2006.08.005    

      CLC: TM621
    • Published:2006

    移动端阅览

  • FENG Xing-long. TYPE AND CAPACITY SELECTION OF BYPASS SYSTEM FOR TURBINE UNITS[J]. Thermal Power Generation, 2006, (8): 12-15. DOI: 10.19666/j.rlfd.2006.08.005.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

238

下载量

13

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

ALLOCATION AND CAPACITY SELECTION OF BYPASS SYSTEM FOR LOCALIZED 600MW UNITS
APPLICATION OF VARIOUS STEAM SEALS FOR STEAM TURBINES AND COMPARISON THEREOF
UTILIZATION OF BY-PASS SYSTEM IN THE PROCESS OF COLD-STATE START-UP FOR 300 MW TURBO-GENERATOR SET
APPLICATION OF A NEW TYPE SPRING RAPID SHUT-OFF VALVE ONTO STEAM TURBINE UNITS
DISPOSAL OF OVERTEMPERATURE FOR STEAM EXTRACTED FROM FIVETH AND SIXTH SECTION OF SUPERCRITICAL 600MW STEAM TURBINE UNIT

Related Author

KONG jian
LI Xujun
ZHANG YuGuodian Taiyuan Thermal Power Plant No.1
ZHANG Xiao-dong
WEI Yong-bo
MENG JieHuaneng Shang'an Power Plant
GUAN Hong-chenNorth-east China Electric Power Regulating Technology Co Ltd
LI Xue-kun

Related Institution

Guodian Thermal Power Research Institute
Guodian Taiyuan First Thermal Power Plant
Huaneng Shang'an Power Plant
Shenyang Northeast Electric Power Regulation Technology Co., Ltd
0