您当前的位置:
首页 >
文章列表页 >
ANALYSIS AND REMEDY OF VALVE STEM LEAKAGE FOR HIGH-PRESSURE MAIN STEAM VALVE OF 300 MW UNIT
Thermal Power Generation   Issue 8, Pages: 36-37(2006)
更新时间:2025-09-28
    • ANALYSIS AND REMEDY OF VALVE STEM LEAKAGE FOR HIGH-PRESSURE MAIN STEAM VALVE OF 300 MW UNIT

    • DOI:10.19666/j.rlfd.2006.08.012    

      CLC: TM621.3
    • Published:2006

    移动端阅览

  • LI Jie, TIAN Wen-zeng. ANALYSIS AND REMEDY OF VALVE STEM LEAKAGE FOR HIGH-PRESSURE MAIN STEAM VALVE OF 300 MW UNIT[J]. Thermal Power Generation, 2006, (8): 36-37. DOI: 10.19666/j.rlfd.2006.08.012.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

123

下载量

1

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

RETROFITTING FOR OPTIMIING EQUIPMENT AND SYSTEM FOR HOME-MADE 300MW TURBINE UNIT OF IMPORTED TYPE
GENERAL-PURPOSE CALCULATION MODEL FOR INFLUENCE OF HEATER'S THERMINAL TEMPERATURE DIFFERENCE UPON THE EXERGY LOSS DISTRIBUTION IN REGENERATIVE SYSTEM

Related Author

王栩
宫奎
高兴生
杨希刚
ZENG Qinghua1
YU Shumei2
ZHOU Xuebin1
HAN Yan'guang1 1.Hunan Electric Power Science Research Institute

Related Institution

Shiheng Power Plant
Shiheng Power Plant, Feicheng
Shandong Feicheng
Hunan Electric Power Research Institute
College of Energy and Power Engineering, North China Electric Power University
0