您当前的位置:
首页 >
文章列表页 >
ANALYSIS ABOUT ECONOMIC BEHAVIOR IN OPERATION OF HIGH-PRESSURE HEATER FOR 300 MW UNIT
Thermal Power Generation   Issue 8, Pages: 38-41(2006)
更新时间:2025-09-28
    • ANALYSIS ABOUT ECONOMIC BEHAVIOR IN OPERATION OF HIGH-PRESSURE HEATER FOR 300 MW UNIT

    • DOI:10.19666/j.rlfd.2006.08.013    

      CLC: TM621.3
    • Published:2006

    移动端阅览

  • CHEN Qing-hui. ANALYSIS ABOUT ECONOMIC BEHAVIOR IN OPERATION OF HIGH-PRESSURE HEATER FOR 300 MW UNIT[J]. Thermal Power Generation, 2006, (8): 38-41. DOI: 10.19666/j.rlfd.2006.08.013.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

160

下载量

4

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

ENHANCEMENT OF SAFETY AND ECONOMIC ASPECT FOR HEAT REGENERATIVE SYSTEM OF AN IMPORTED TYPE 300MW UNIT
PRIMARY FREQUENCY REGULATION PERFORMANCE TEST OF A 300MW FOSSIL-FIRED GENERATING UNIT
COMPARISON AND ANALYSIS OF THERMODYNAMIC PERFORMANCE BEFORE AND AFTER RETROFITTING A 300MW UNIT AT JIANBI POWER PLANT
APPLICATION XDPS400 DISTRIBUTED CONTROL SYSTEM ON NEWLY BUILT 300MW UNITS
APPLICATION OF DYNAMIC PROGRAMMING ON LOAD DISTRIBUTION OPTIMIZATION AMONG HOME-MADE 300MW GENERATING UNITS

Related Author

ZHANG Cun-sheng
SUN Shu-yang
DAI Chuan-long
杨群
周平涛
田丰
周绍兴
李新康

Related Institution

The Pearl River Power Plant Guangzhou
Jianbi Power Plant
Shenzhen West Electric Power Co., Ltd
Mawan Power Plant
0