您当前的位置:
首页 >
文章列表页 >
STUDY ON CALCULATION METHOD FOR TARGET VALUE OF BOILER OPERATION OPTIMIZATION IN THERMAL POWER PLANTS
Thermal Power Generation   Issue 9, Pages: 27-29(2006)
更新时间:2025-09-28
    • STUDY ON CALCULATION METHOD FOR TARGET VALUE OF BOILER OPERATION OPTIMIZATION IN THERMAL POWER PLANTS

    • DOI:10.19666/j.rlfd.2006.09.009    

      CLC: TM621.2
    • Published:2006

    移动端阅览

  • STUDY ON CALCULATION METHOD FOR TARGET VALUE OF BOILER OPERATION OPTIMIZATION IN THERMAL POWER PLANTS[J]. Thermal Power Generation, 2006, (9): 27-29. DOI: 10.19666/j.rlfd.2006.09.009.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

1089

下载量

24

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

APPLICATION OF LOW PHOSPHATE BOILER-WATER TREATMENT IN HONGYANGCHI POWER PLANT NO.2
VARIABLE-FREQUENCY RETROFIT OF SPEED-REGULATING CONTROL SYSTEM FOR PULVERIZED COAL FEEDER OF BOILER NO.1 IN MINE-MOUTH POWER PLANT OF PINGMEI GROUP
FORECAST OF OPTIMAL OXYGEN CONTENT IN FLUE GAS FROM UTILITY BOILER BASED ON ARTIFICIAL INTELLIGENT TECHNOLOGY
DEVELOPMENT AND APPLICATION OF PLANTLEVEL SUPERVISORY CONTROL SYSTEM FOR SUPERCRITICAL THERMAL POWER UNITS
ANALYSIS OF CONSUMPTION DEVIATION FOR MAIN OPERATION PARAMETERS OF BOILERS IN THERMAL POWER PLANT

Related Author

王守霞
王建琪
惠茂盛
李晓襄
YANG Guiying
LIU Feng
LIU Guangcai
ZHAO Xu-xin

Related Institution

Hongyanchi Second Power Generation Co., Ltd
Hongyanchi Second Power Generation Co., Ltd.
China University of Mining and Technology
Pingmei Group Kengkou Power Plant
0