您当前的位置:
首页 >
文章列表页 >
DEBUGGING OF DEH GOVERNING SYSTEM FOR 600 MW SUPERCRITICAL UNIT IN HUANENG QINBEI POWER PLANT AND CONTROL IMPROVEMENT
Thermal Power Generation   Issue 9, Pages: 40-43(2006)
更新时间:2025-09-28
    • DEBUGGING OF DEH GOVERNING SYSTEM FOR 600 MW SUPERCRITICAL UNIT IN HUANENG QINBEI POWER PLANT AND CONTROL IMPROVEMENT

    • DOI:10.19666/j.rlfd.2006.09.014    

      CLC: TK323
    • Published:2006

    移动端阅览

  • DEBUGGING OF DEH GOVERNING SYSTEM FOR 600 MW SUPERCRITICAL UNIT IN HUANENG QINBEI POWER PLANT AND CONTROL IMPROVEMENT[J]. Thermal Power Generation, 2006, (9): 40-43. DOI: 10.19666/j.rlfd.2006.09.014.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

192

下载量

4

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

CAUSE ANALYSIS OF HIGHER MAIN STEAM TEMPERATURE DURING ROTATION-IMPULSING TO START UP 600 MW SUPERCRITICAL UNIT AND ADOPTED MEASURES
Fieldbus commissioning method and problem handling for coal-fired power plants
APPLICATION OF APS ONTO GAS-STEAM COMBINED CYCLE UNITS
APPLICATION OF FUZZY CONTROL IN RETARTED CONTROL SYSTEM WITH BIG TIME-DELAY AT POWER PLANTS
ANALYSIS OF RELIABILITY-ENHANCING IN START-UP COMMISSIONING OF A COMPLETE HOME-MADE 125MW TURBO-GENERATOR SET

Related Author

黄伟
TAN Xiangshuai
CHEN Kun
GAO Kui
LIANG Zhao
WU Heng-yun
ZHANG Xiao-bang
YAN Xu-yan

Related Institution

Hunan Electric Power Test and Research Institute
Xi'an Thermal Power Research Institute Co.,Ltd.
Zhejiang University
Guangdong Electric Power Test and Research Institute
0