您当前的位置:
首页 >
文章列表页 >
TEST STUDY ON EMISSION CONTROL OF ABSORBABLE PARITCLES INTO ELECTROSTATIC PRECIPITATORS FOR 300 MW UNIT
Thermal Power Generation   Issue 10, Pages: 37-39(2006)
更新时间:2025-09-28
    • TEST STUDY ON EMISSION CONTROL OF ABSORBABLE PARITCLES INTO ELECTROSTATIC PRECIPITATORS FOR 300 MW UNIT

    • DOI:10.19666/j.rlfd.2006.10.012    

      CLC: X701.2
    • Published:2006

    移动端阅览

  • TEST STUDY ON EMISSION CONTROL OF ABSORBABLE PARITCLES INTO ELECTROSTATIC PRECIPITATORS FOR 300 MW UNIT[J]. Thermal Power Generation, 2006, (10): 37-39. DOI: 10.19666/j.rlfd.2006.10.012.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

217

下载量

17

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

Experiments about synergistic dust removal by WFGD system
TROUBLESOME PROBLEMS EXISTING IN ELETROSTATIC PRECIPITATORS AT ZHUJIANG POWER PLANT AND IMPROVEMENT MEASURES THEREOF
SIMULATION TEST STUDY AND APPLICATION OF A COMBINED DUST-ELIMINATING MODE BEING COMPOSED OF ELECTRIC PRECIPITATOR AND VENTURI WATER FILM SCRUBBER
MAIN PROBLEMS EXISTING IN THE ONSERVICE ELECTRIC PRECIPITATORS AT COALFIRED POWER PLANTS AND COUNTERMEASURES THEREOF
AN APPROACH TO PROBLEM OF CORRECTING DUST REMOVAL EFFICIENCY FOR ELETROSTATIC PRECIPITATORS

Related Author

HUAN Xuanzhou
HE Yudong
WANG Shaoliang
TAO Ming
WANG Yun-chi
李广民
李广建
祁君田

Related Institution

Xi’an Thermal Power Research Institute Co., Ltd.
The Pearl River Power Plant Guangzhou
Pingdingshan Coal Industry Group Kengkou Power Plant
0