您当前的位置:
首页 >
文章列表页 >
ANALYSIS OF STARTING UP THROUGH IP CYLINDER FOR SUPERCRITICAL STEAM TURBINE
Thermal Power Generation   Issue 11, Pages: 4-7(2006)
更新时间:2025-09-28
    • ANALYSIS OF STARTING UP THROUGH IP CYLINDER FOR SUPERCRITICAL STEAM TURBINE

    • DOI:10.19666/j.rlfd.2006.11.002    

      CLC: TK267
    • Published:2006

    移动端阅览

  • ANALYSIS OF STARTING UP THROUGH IP CYLINDER FOR SUPERCRITICAL STEAM TURBINE[J]. Thermal Power Generation, 2006, (11): 4-7. DOI: 10.19666/j.rlfd.2006.11.002.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

121

下载量

0

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

Influence of exhaust temperature on experimental results of operation optimization for steam turbines
Experimental study on banked fire for peak regulation of supercritical circulating fluidized bed units
Experimental study on start-stop peak regulation of a 350 MW supercritical circulating fluidized bed coal-fired power unit
Economic research on desulfurization and denitration for a supercritical 350 MW circulating fluidized bed boiler
Optimization and fixed value disturbance test analysis for coordination control system of a supercritical 660 MW unit

Related Author

CHEN Shengli
JING Tao
LI Gaochao
LV Kai
ZHANG Zhiguo
MU Lin Xi'an Thermal Power Research Institute Co.Ltd.
佟博恒
李玉

Related Institution

Xi'an Thermal Power Research Institute Co., Ltd
Shenhua Guoneng (Shendong Power) Group
Hebei Engineering Research Center of Simulation & Optimized Control for Power Generation,North China Electric Power University
Control Technology Department,Zhejiang Energy Group R&D
Hebei Guohua Dingzhou Power Generation Co.,Ltd.,Dingzhou
0