您当前的位置:
首页 >
文章列表页 >
ESTABLISHMENT OF SERVICE LIFE MANAGEMENT SYSTEM FOR HIGH-TEMPERATURE BOILER TUBES IN THERMAL POWER PLANT BASED ON B/S STRUCTURE
Thermal Power Generation   Issue 1, Pages: 12-14(2007)
更新时间:2025-09-28
    • ESTABLISHMENT OF SERVICE LIFE MANAGEMENT SYSTEM FOR HIGH-TEMPERATURE BOILER TUBES IN THERMAL POWER PLANT BASED ON B/S STRUCTURE

    • DOI:10.19666/j.rlfd.2007.01.004    

      CLC: TK223.3
    • Published:2007

    移动端阅览

  • DU Bao-hua, LI Yao-jun, LIU Zhen-yu, et al. ESTABLISHMENT OF SERVICE LIFE MANAGEMENT SYSTEM FOR HIGH-TEMPERATURE BOILER TUBES IN THERMAL POWER PLANT BASED ON B/S STRUCTURE[J]. Thermal Power Generation, 2007, (1): 12-14. DOI: 10.19666/j.rlfd.2007.01.004.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

149

下载量

11

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

CALCULATION OF WALL-TEMPERATURE FOR SUPERHEATER AND REHEATER OF HG670/13.7-YM13 TYPE BOILER
ANALYSIS AND TREATMENT OF SOMEWHAT LOWER MAIN STEAM TEMPERATURE PROBLEM FOR 2045 t/h BOILER
CAUSE ANALYSIS OF FREQUENT BURST-LEAKAGE OCCURRED ON REHEATER AND WATER-WALL OF 300 MW UTILITY BOILER
CAUSE ANALYSIS OF HIGH EXHAUST GAS TEMPERATURE FROM HG-450/13.7-YM24 BOILER AND RETROFIT THEREOF
ON-LINE MONITORING OF TUBE-WALL TEMPERATURE FOR SUPERHEATER AND REHEATER IN FURNACE OF SUPER CRITICAL BOILERS

Related Author

LIU Tong
XU Gang
XIANG Chunzheng
YIN Gang (Xi’an Jiaotong University
ZHOU Bao-shan
ZHU Xiao-shui
CHEN Peng
DONG Gang

Related Institution

North China Electric Power University
North China Electric Power University Beijing
Zhejiang Electric Power Construction Corporation
Huadian Pucheng Power Plant
0