CAUSE ANALYSIS OF HIGH-PRESSURE HEATER LEAKAGE FOR 300MW UNIT AND COUNTERMEASURES THEREOF
Thermal Power Generation   Issue 1, Pages: 54-57(2007)
更新时间:2025-09-28
    • CAUSE ANALYSIS OF HIGH-PRESSURE HEATER LEAKAGE FOR 300MW UNIT AND COUNTERMEASURES THEREOF

    • DOI:10.19666/j.rlfd.2007.01.016    

      CLC: TK223.3
    • Published:2007

    移动端阅览

  • CAO Zhi-yang(Huaneng Pinliang Power Generation Co Ltd. CAUSE ANALYSIS OF HIGH-PRESSURE HEATER LEAKAGE FOR 300MW UNIT AND COUNTERMEASURES THEREOF[J]. Thermal Power Generation, 2007, (1): 54-57. DOI: 10.19666/j.rlfd.2007.01.016.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

101

下载量

0

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

CAUSE ANALYSIS OF SOMEWHAT LOW RATE FOR PUTTING HIGH-PRESSURE HEATER OF 200 MW UNITS INTO SERVICE AND RETROFITTING MEASURES THEREOF
CAUSE ANALYSIS AND DISPOSAL OF ABNORMAL OPERATION FOR EXTERNALLY ARRANGED STEAM COOLER OF THE HIGH-PRESSURE HEATER
RETROFITTING OF AUXILIARY VALVE FOR SOLENOID BLOWOUT VALVES
OPTIMIZATION OF DEB COORDINATED CONTROL SYSTEM FOR 300 MW UNIT
ANALYSIS OF SUPERHEATER'S TUBE-BURST CAUSED BY FALLING-AWAY OF OXIDE SKIN

Related Author

HE Dongrong
ZHANG Qin-chuan
AN Guang-hui
SU Yan-anHuadian Pucheng Power Generation Co Ltd
LUO Sheng
HE Tong-xiang
ZHANG Hua-lei
LI Ya-jun

Related Institution

Shaoguan Power Plant
Huadian Pucheng Power Generation Co., Ltd
The Pearl River Power Plant Guangdong
North China Electric Power University
Huadian Xinjiang Branch
0