ANALYSIS OF ABNORMALITIES OCCURRED IN THE VACUUM SYSTEM OF 350 MW UNIT MANUFACTURED BY MITSUBISHI CORPORATION
Thermal Power Generation   Issue 2, Pages: 52-54(2007)
更新时间:2025-05-30
    • ANALYSIS OF ABNORMALITIES OCCURRED IN THE VACUUM SYSTEM OF 350 MW UNIT MANUFACTURED BY MITSUBISHI CORPORATION

    • DOI:10.19666/j.rlfd.2007.02.016    

      CLC: TK264.11
    • Published:2007

    移动端阅览

  • XU Xian-long, ZHANG Jin-bao. ANALYSIS OF ABNORMALITIES OCCURRED IN THE VACUUM SYSTEM OF 350 MW UNIT MANUFACTURED BY MITSUBISHI CORPORATION[J]. Thermal Power Generation2007, (2): 52-54. DOI: 10.19666/j.rlfd.2007.02.016.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

63

下载量

3

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

ELIMINATION OF LEAKAGE IN VACUUM SYSTEM OF UNIT NO.4 IN ZHANGZE POWER PLANT
ON-LINE OPTIMIZED OPERATION OF THE CIRCULATING WATER PUMP FOR 300 MW UNIT
STUDY ON MEASURING METHOD FOR FLOW RATE OF AIR LEAKING INTO CONDENSER AND VACUUM SYSTEM
QUANTITATIVE RELATIONSHIP BETWEEN THE VACUUM TIGHTNESS AND THE LEAKING AIR FLOW RATE INTO CONDENSER
TEST AND ANALYSIS OF CAUSES LEADING TO LEAKAGE IN CONDENSER OF STEAM TURBINE

Related Author

WANG Chen-yu
TIAN Xiao-dong
LIU Fu-jun Tangshan Thermal Power Co Ltd
JU Wen-ping
MA Ting-shan
YU Xin-yingXi'an Thermal Power Research Institute Co Ltd
MA Ting-shan1
JIANG An2

Related Institution

Zhangze Power Plant
Tangshan Thermal Power Company
Xi'an Thermal Power Research Institute Co., Ltd
Northwest Electric Power Design Institute
Huaneng Shang'an Power Plant
0