您当前的位置:
首页 >
文章列表页 >
REPAIR OF THRUST COLLAR WORN-OUT FOR MAIN OIL PUMP OF N210 MW STEAM TURBINE AND PREVENTIVE MEASURES THEREOF
Thermal Power Generation   Issue 2, Pages: 60-62(2007)
更新时间:2025-05-30
    • REPAIR OF THRUST COLLAR WORN-OUT FOR MAIN OIL PUMP OF N210 MW STEAM TURBINE AND PREVENTIVE MEASURES THEREOF

    • DOI:10.19666/j.rlfd.2007.02.019    

      CLC: TK268
    • Published:2007

    移动端阅览

  • ZHANG Ming-min. REPAIR OF THRUST COLLAR WORN-OUT FOR MAIN OIL PUMP OF N210 MW STEAM TURBINE AND PREVENTIVE MEASURES THEREOF[J]. Thermal Power Generation2007, (2): 60-62. DOI: 10.19666/j.rlfd.2007.02.019.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

89

下载量

1

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

RETROFIT OF LUBRICATING OIL SYSTEM FOR 330MW STEAM TURBINE
ANALYSIS AND REMEDY OF BURST-LEAKAGE OF "FOUR KINDS OF TUBE" IN BOILERS OF SHIMEN POWER PLANT
CAUSE ANALYSIS OF ECONOMIZER WORN-OUT FOR A 670 t/h BOILER IN ONE POWER PLANT AND RETROFITTING DESIGN THEREOF
CAUSE ANALYSIS ABOUT LEAKAGE OF "FOUR TUBE KINDS" IN BOILERS
RETROFIT OF AIR CAP FOR A 130t/h CFB BOILER

Related Author

XU Weimin
GUO Qing-feng
HUANG Jing-li(North China Electric Power University
LIU Ya-zhi
XING De-shan
YAN Wei-ping
LI Jun
DONG Chuan-min2

Related Institution

Pucheng Power Generation Co., Ltd., Pucheng
Shimen Power Plant
North China Electric Power University
Datang Tokto Power Generation Co., Ltd
Baoding Electric Power Vocational and Technical College
0