您当前的位置:
首页 >
文章列表页 >
ANALYSIS AND COMPARISON OF PERFORMANCE BETWEEN TWO KINDS OF TURBINE-BOILER COORDINATED CONTROL SYSTEM
Thermal Power Generation   Issue 2, Pages: 70-72+84(2007)
更新时间:2025-05-30
    • ANALYSIS AND COMPARISON OF PERFORMANCE BETWEEN TWO KINDS OF TURBINE-BOILER COORDINATED CONTROL SYSTEM

    • DOI:10.19666/j.rlfd.2007.02.022    

      CLC: TK323
    • Published:2007

    移动端阅览

  • WANG Shi-hai1, JIA Qiang-bang1, LI Jin-tao2, et al. ANALYSIS AND COMPARISON OF PERFORMANCE BETWEEN TWO KINDS OF TURBINE-BOILER COORDINATED CONTROL SYSTEM[J]. Thermal Power Generation2007, (2): 70-72+84. DOI: 10.19666/j.rlfd.2007.02.022.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

206

下载量

7

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

STUDY ON GENERALIZED PREDICTION CONTROL WITH DECOUPLING OF COORDINATED CONTROL SYSTEM
Optimization and fixed value disturbance test analysis for coordination control system of a supercritical 660 MW unit
A coordinated control system based on model predictive coal supply feedforward
Fuzzy assessment of performance of coordinated control system in thermal power unit based on covariance index
THE OPTIMIZATION STRATEGY OF COORDINATED CONTROL SYSTEM FOR 600 MW THERMAL POWER PLANT

Related Author

ZHANG Li-ping21.College of Electric Power Engineering
ZHANG Jia-ying1
WANG Wen-lan1
QIAN Neng
LI Ke
WANG Yinsong
JI Yu
YAO Cuixia

Related Institution

School of Electric Power, Inner Mongolia University of Technology
Inner Mongolia Electric Power Research Institute
Hebei Engineering Research Center of Simulation & Optimized Control for Power Generation,North China Electric Power University
Control Technology Department,Zhejiang Energy Group R&D
Linhe Thermal Power Plant, China Huaneng Group, Linhe
0